Scope of Works

Carry out audit of existing air flow rates and provide detailed report on findings.

Research and recommend individual components to be installed as fully functioning system.

Decommission and remove existing CO Monitoring System

Supply and install new CO Monitoring System inclusive of CO Controller and extension modules, CO sensors over 3 car park levels and associated control cabling and conduits.

Upgrade lower basement fan motor to MEPS2 Compliant unit, install and align new mountings, pulley and associated drive belts.

Install new VSD’s and shielded motor cabling to lower basement and ground floor fan units.

Install and commission control links between CO System Controller and VSD units on 2 car park levels to provide staged ventilation dependent on individual CO sensor readings.

Carry out commissioning of Air Handling system including Air Balancing, all carried out by NEBB qualified personnel.

Provide As-Installed documentation including technical information and cabling diagrams.